Kalimantan production pit
GS300 commissioned on a continuous-feed alluvial concession. Customer's previous plant was a fixed wash table that bottlenecked at 120 t/hr. The GS300 cleared 280 t/hr at the recovery target in week two.
A working archive of the workshop. Photographs from active sites across Asia-Pacific, plus operational video of the machines at production tempo. Click any frame to view full size.


































Each plant is a one-of-one build for a specific operator and a specific pit. A few from the last eighteen months.
GS300 commissioned on a continuous-feed alluvial concession. Customer's previous plant was a fixed wash table that bottlenecked at 120 t/hr. The GS300 cleared 280 t/hr at the recovery target in week two.
GS250T crawler delivered to a Highlands operator after the access road washed out for the second wet season running. Crawler drove three kilometres of unstable track to the dig face on its own.
GS100 trailer plant for a Laotian contractor running three seasonal claims. Hooked up to a single prime mover, the plant moves between sites in a day, sets up in under the hour, and runs production until the dry breaks.